Here you’ll find the City’s completed projects in 2018. As-built drawings for all completed projects are available through the As-Built Locator.
Project Summary
This project included installing the new sidewalks and ramps to meet the current ADA standards, replacing all of the non-ADA-compliant ramps, and adding a pedestrian-activated flashing crosswalk beacon. The route forced pedestrians to use the road shoulder or lane of travel which creates a dangerous situation for pedestrians and drivers. This route is an important connector for pedestrian access to facilities and the adjacent multi-family and neighboring housing. This project was completed in conjunction with the Pioneer Park Sidewalk Project.
Project Details
- Contractor: P&P Excavating LLC
- Contract Amount: $442,827
- Contract Awarded: 07/20/2018
- Bid Tabulation (PDF)
Project summary
This project installed approximately 1400 linear feet of new storm pipe and structures within an easement located between Riverside Drive and the Nooksack River. Work included placement of 12”, 48”, and 60” diameter storm pipe conveyance lines, constructing an outfall at the Nooksack River, and building a gravel maintenance road atop the storm alignment.
Project Details
- Contractor: Dirt Works Bellingham Inc.
- Contract Amount: $568,197
- Contract Awarded: 08/16/2017
- Bid Tabulation (PDF)
Project Summary
This project installed approximately 1,000 linear feet of sidewalk along Cherry Street and 3rd Avenue, from 1st Avenue to Maple Street, and the installation of approximately 1,230 linear feet of stamped and colored sidewalk within Pioneer Park. The work included the removal of structures and obstructions, grading, installation of storm pipe and catch basins, placing of gravel base, curb, gutter, sidewalk and sidewalk ramp installation. This project was completed in conjunction with the Cherry Street Sidewalk Project.
Project Details
- Contractor: P&P Excavating LLC
- Contract Amount: $442,827
- Contract Awarded: 07/20/2018
- Bid Tabulation (PDF)
Project Summary
The use of the Portal Way/ I-5 interchange increased following the improvements to Second Ave and the installation of the single-lane roundabout at the southbound interchange. This project increased capacity, improved safety, and provided an increased level of service at this intersection by constructing a compact roundabout.
Project Details
- Contractor: Colacurcio Brothers Inc.
- Contract Amount: $293,492
- Contract Awarded: 06/04/2018
- Bid Tabulation (PDF)
Project Summary
The City, along with other municipalities in Washington State, partnered with the Transportation Improvement Board (TIB) and Puget Sound Energy (PSE) aiming to lower Cities’ street light electric bill costs by converting bulbs and fixtures to more energy-efficient LEDs. This program, called Relight Washington, was wholly funded by TIB and resulted in no upfront or direct cost to Ferndale citizens and taxpayers. The City will benefit from the overall reduction of the utility bill to power the lights.
Project Summary
This project installed a new sanitary sewer gravity main on Thornton Street beginning east of Malloy Avenue and extended to Portal Way, via a bore under the BNSF railroad tracks. This project also had the benefit of diverting significant wastewater flows to the system on Portal Way thereby allowing the City to eliminate the need to upsize several segments of existing sewer collection mains located along a corridor between Malloy Avenue and BNSF’s tracks.
Project Details
- Contractor: Colacurcio Brothers Inc.
- Contract Amount: $999,400
- Contract Awarded: 10/02/2017
- Bid Tabulation (PDF)
Project Summary
This project widened and improved Washington Street from Main Street to Vista Drive to include new sidewalks, curbs, gutters, shoulders for bicycle use, an improved bus pullout, and 11’ wide travel lanes for vehicles. As part of the project, the City’s existing and aging utilities, including water, sewer, and stormwater, were replaced and/or improved.
Project Details
- Contractor: RAM Construction General Contractors, LLC
- Contract Amount: $1,962,795
- Contract Awarded: 03/26/2018