2021
Here you’ll find the City’s completed projects in 2021. As-built drawings for all completed projects are available through the As-Built Locator.
Project Summary
This project provided additional accessibility for Ferndale’s lower downtown core by constructing Americans with Disabilities Act (ADA) enhancements at the intersections of; First Avenue/ Alder Street, Second Avenue/ Alder Street, and Third Avenue/ Alder Street.
The intersections of Thornton Street/ Maureen Drive, and Vista Drive/ Seamount Drive were also upgraded with ADA improvements as well as the installation of rectangular rapid flash beacons (RRFB). Additional work included removal of existing ramps, storm drain modifications, installation of ADA ramps, installation of RRFB, and other work.
Project Details
- Contractor: Larry Brown Construction Inc.
- Contract Amount: $214,036
- Contract Awarded: 10/20/2020
- Bid Tabulation (PDF)
Project Summary
Pump station 19 served the Malloy Village subdivision, located north of Thornton Street and east of Malloy Avenue. In early 2018, the City completed the Thornton Street Sewer Extension Project which involved the installation of a new sanitary sewer gravity main on Thornton Street, beginning at Malloy Avenue and extending to the roundabout at Portal Way and Second Avenue via bore under BNSF Railway’s tracks. Thanks to this project, the City was able to divert significant wastewater flows to Portal Way and Second Avenue and ease capacity issues on several segments of existing sewer collection mains (including pump station 19) located on the corridor, between Malloy Avenue and BNSF tracks. This project installed a new gravity sewer main, connecting Malloy Village to the new Thornton Road sewer system and allowing the City to decommission pump station 19.
Project Details
- Contractor: Strider Construction Co. Inc.
- Contract Amount: $570,650
- Contract Awarded: 10/13/2020
- Bid Tabulation (PDF)