Ferndale Utility Rate Study

  1. 1 Pumps
  2. 2 RO Unit smaller
  3. 3 Touch Read
  4. 4 Well Pump House
  5. 5 Water Tank
  6. 6 SCADA system

Ferndale Rate Study Project

With rising costs and scheduled expansions to the city's infrastructure, the City is conducting a rate study project. This study determines the adjustments in rates needed to pay for forecasted changes in expenses in a fair and equitable way.

Below you will find information on our utility system and how you can best be involved in this process.

Proposed Rate Structure