Lane Shift Closure on Main Street between Sterling Ave and 4th Ave. Thursday, October 16th through Friday, October 24th
Drivers should expect delays near 2113 Main St as traffic is lane shifted through the area. Generally, two lanes of traffic will remain open but at times flaggers may briefly stop all traffic. This traffic revision is in effect from 7:00 AM to 5:00 PM each weekday between Thursday, October 16th and Friday, October 24th.
Contractors will work on both the North and South sides of Main St. at different times.
NORTH WORK ZONE
Only one entrance/exit into the Post Office Main St parking lot.
RIGHT TURN ONLY into and out of the Post Office parking lot.
RIGHT TURN ONLY into and out of 7-Eleven.
If possible, use the 4th Ave access points for the Post Office and 7-Eleven.
SOUTH WORK ZONE
Both driveways into the Post Office Main St parking lot will be open.
RIGHT TURN ONLY into and out of the Post Office parking lot.
RIGHT TURN ONLY into and out of 7-Eleven.
If possible, use the 4th Ave access points for the Post Office and 7-Eleven.
This traffic revision is for utility work associated with Ferndale’s Civic Campus Project.
NORTH WORK ZONE

SOUTH WORK ZONE