- Home
- Departments
- Public Works Department
- Capital Projects
- Future / Design Projects
Future / Design Projects
-
Evergreen Way Cedar Creek Conveyance
To address surface flooding during large storm events this project will upsize and realign stormwater conveyance from Grouse Circle along Evergreen Way and Sunshine Drive to an outfall to Cedar Creek.
-
Ferndale Levee Improvement Project
As part of a multi-year effort to improve the levee system along the Nooksack River, the City of Ferndale, Whatcom County and the State of Washington are collaborating on a levee improvement project directly adjacent to Pioneer Park.
-
Grandview Sewer Extension Project
The City of Ferndale annexed the Grandview area in approximately 2010. Since the annexation, lack of sewer service has limited the development potential in the area. The City, working in conjunction with Wilson Engineering, has prepared a preliminary design that will form the basis for full design of the Grandview Sewer Extension.
-
Main Street Reconstruction Project
Main Street east of Barrett Road is substandard in width, has no formal pedestrian facilities and is often heavily damaged during weather events and heavy traffic.
-
Portal Way Interchange Project
This project will improve Portal Way between the northbound Interstate-5 and southbound Interstate-5 interchanges by replacing the northbound compact roundabout with a full-size roundabout including pedestrian and bicycle facilities where none currently exist and upgrading the illumination system as appropriate.
-
Thornton Terrace Storm Pond Improvements
This project will retrofit an existing stormwater pond to provide treatment and additional flow control for runoff from approximately 102 acres to protect and improve water quality in Schell Creek.
-
Utility Rate Study Project
The City of Ferndale, Washington desires to solicit interest from firms with experience in performing utility rate studies to complete a comprehensive rate study of the City’s water, sanitary sewer, and stormwater rate structure.
-
Vista Ridge Trail Project
The City is excited to announce the construction of the Vista Ridge Trail project. Currently slated for the Spring/Summer of 2019, these trails will connect Vista Drive with the one mile of trails currently constructed as part of the Malloy Terrace development.
-
Wastewater Local Improvement District (LID)
The City of Ferndale is seeking a certified real estate appraiser to complete a two-stage special benefit study for a proposed Local Improvement District (LID) extending wastewater service to the Grandview Area in north Ferndale.