![]() |
This project was considered to be one of the highest priority for improvements to the city's sewer collection system.
The project called for replacement of a failing gravity sewer system located in three alleys in the Griffintown area with new sewer mains and manholes.
The engineer's estimate for this project was $530,243.93.
Documents
Current Temperature